Enercat Trim Tool: Precision Deposition Prevention
for Targeted Applications

Designed for surface and downhole applications where localized deposition control is critical, the Enercat Trim Tool provides a cost-effective solution for preventing paraffin, scale, and asphaltene buildup in pump assemblies and other targeted areas, ensuring continuous fluid flow and equipment longevity. Built for reliability, the Trim Tool offers maintenance-free operation while complementing Synergetic’s full suite of deposition prevention tools.
KEY FEATURES

How it Works

Installed within the pump assembly, where it directly interacts with produced fluids to prevent paraffin, scale, and asphaltene deposition at critical flow points, the Enercat Trim Tool emits low-frequency vibrations that disrupt crystallization processes that cause blockages and mechanical strain. Its compact, maintenance-free design ensures seamless integration with standard pump configurations, providing localized deposition control without requiring external power.
The Enercat Trim Tool is engineered for precision deposition control in targeted applications, ensuring smooth pump operation and uninterrupted fluid flow.
Precision Deposition Prevention
Designed to prevent paraffin, scale, and asphaltene buildup in pump assemblies and other high-deposition zones, the Enercat Trim Tool actively protects critical flow paths, minimizing disruptions and mechanical strain.
Compact, Targeted Design
With a lightweight and adaptable configuration, the Enercat Trim Tool integrates seamlessly into pump systems and surface applications, delivering localized treatment where it’s needed most without requiring system modifications.
Durable, Maintenance-Free Construction
Made in the USA and built from high-strength materials, the Enercat Trim Tool is engineered to provide targeted deposition control at key flow points, keeping production equipment running smoothly.
PROVEN RESULTS

Engineered for Surface Efficiency and Enhanced Flow Stability

Engineered for surface applications, the Enercat Trim Tool effectively mitigates paraffin and scale deposition, ensuring steady fluid transport and reduced mechanical strain. Field tests confirm improved production efficiency, extended equipment lifespan, and minimized operational disruptions.
Extended Pump Life & Reduced Paraffin Deposition
Arrow Down Icon
Increased Oil Production & Pump Efficiency
Arrow Down Icon
Increased Efficiency in Heavy Oil Operations
Arrow Down Icon
“I am very satisfied with Enercat Tools. They effectively prevent wax and asphaltene accumulation, and we plan to use them as a standard procedure during completion operations on new wells and workover operations on existing production.”
Alan B. Seaman
President | Chipman Energy Limited
RUGGED DESIGN

Synergetic Enercat Trim Tool

Technology & Innovation
Application & Environment
Materials & Construction
Specifications & Installation
FEATURES

Compare Tool Systems

Enercat Trim Tool
Enercat Tubing Tool
Avenger Tool
Application
Downhole and Surface
Downhole
Downhole
Corrosion
Corrosion Resistant
Corrosion Resistant
Corrosion Proof
Installation
Pump Assemblies
Tubing String
Tubing String
Compatibility
N/A
2-3/8” & 2-7/8” API Tubing
2-3/8” & 2-7/8” API Tubing
Modular
No
No
Yes
Sealed Chamber
No
No
Yes

Let Us Help Find The Right Tool for Your Production Needs

Connect with our experts to assess your production environment and determine the ideal Synergetic tool for your operations.
OUR PROCESS

Working With Synergetic: Assessment, Analysis & Assurance

Synergetic’s process is designed to deliver lasting value at every stage of your operation. From selecting the right tool to ensuring long-term performance, we combine expert analysis, seamless integration, and comprehensive support to optimize production and sustainability.
01
Assessment
Tailored Analysis for Optimal Tool Selection
Our process begins with a thorough assessment of your production environment. We evaluate fluid characteristics, reservoir conditions, and operational demands to determine the most suitable Synergetic tool for your needs.
Fluid dynamics testing (viscosity, paraffin, and scale content).
Reservoir and geological compatibility evaluation.
Operational efficiency and environmental impact analysis.
Deliverable: Customized tool recommendation report.
02
Installation
Seamless Integration into Existing Systems
Synergetic tools are engineered for straightforward installation into standard API-threaded tubing systems. Our skilled technicians ensure proper placement and setup to optimize performance from day one.
Modular, compact design enables easy deployment.
Field support to guide installation.
Compatibility with diverse well configurations and assemblies.
Deliverable: Installation summary and initial performance baseline.
03
Monitoring
Real-Time Performance Insights
Post-installation, we provide advanced monitoring solutions to track the tool’s effectiveness. This ensures continuous production optimization and long-term reliability.
Key metrics: flow rates, deposition levels, and operational stability.
Regular performance evaluations and insights.
Optional: Integration with existing monitoring systems for seamless reporting.
Deliverable: Performance tracking dashboard and quarterly reports.
04
Service & Support
Comprehensive Care for Optimal Performance
Our commitment doesn’t stop after installation. We offer ongoing service and support to address any challenges, ensure tool longevity, and optimize results.
24/7 technical assistance from industry experts.
Routine maintenance consultations (if needed).
On-demand field support for adjustments or replacements.
Deliverable: Tailored service agreement for your operations.
CONNECT

Save Time, Money and the Environment

Efficiency and sustainability aren’t trade-offs—they’re the future of oil production. Synergetic’s innovative downhole tools reduce downtime, lower operating costs, and eliminate the need for harmful chemical treatments. Let’s explore a more innovative, more sustainable solution.